News
About Bamboo
History for Bamboo
Capability of Bamboo
Characteristics of Bamboo Products
Environmentally Friendly Products
Manufacturing Processes
New Products
Products
Bamboo Flooring
Strand Woven Bamboo Flooring
Bamboo Panel
Bamboo Veneer
Bamboo Cutting Board
Accessory
Technical
Installation Instructions
Maintenance Instructions
Contact us
Tel: 086-572-5350591
      086-572-5350592
Fax: 086-572-5350593
E-mail: info@hefengbamboo.com
嶄猟井
Installation Instructions

Pre-Installation:
- Deliver the flooring 48 hours to the job-site prior to installation date for acclimation when possible.
- Check job-site for presence of extreme moisture conditions (Water leaks, high humidity, extreme dry conditions). The area for pre-installation should parallel the future environment of the floor post-installation.

Installation:
All floors must be clean, free of oil, and any adhesive residue. All floors must be level; the maximum   tolerance is 3/16" per 10'. Installers should abide by National Floor Manufactures Association regulations.
Floating Method - can be laid over wood or concrete sub floor.
Nail Down Method - can be laid over wood sub floor.
Glue Down Method - can be laid over wood or concrete sub floor.

Floating Installation:
Material Needed: Non-absorbent 1/8" thick foam pad & Latex glue.
Apply underlaid foam pad over existing sub floor. Start planks square with the room and parallel to its longest dimension, but leaving appropriate expansion space from wall or base plate. Ensure planks are firmly in place by applying a thin glue line on tongue and groove. Once the initial rows are secured, further courses shall be laid simply to glue each plank to the one next to it. At this point, a 2" x 4" wood stub piece can be used by interlocking the tongue and groove. With the completion of these procedures a beautiful floating floor is created.

Nail Down Installation:

Material Needed: Finish nail or Powernailer with powercleats.
Start the planks parallel to the room's longest dimension, but leaving appropriate expansion space from the base plate or wall. Make sure the initial rows are firmly in place by wedging or face nailing. Further courses shall be nailed above tongue at a 45-degree angle to the face, due to the fact that bamboo flooring is harder than oak wood. If nailer is not used, to avoid damage to the plank, drill small hole above tongue to accept the finish nails.

Glue Down Installation:
Material Needed: High grade wood urethane Chemrex #941 adhesive.
When the site where moisture conditions are of no concern, spread wood adhesive.  Start planks square with the room and parallel to its longest dimension, but leaving appropriate expansion space from the base plate or wall. Make sure the initial rows are firmly in place. Apply wood adhesive to the sub floors and place flooring onto wet adhesive immediately.
Hefeng Products
Bamboo Flooring Strand Woven Bamboo Bamboo Panel Bamboo Veneer Cutting Board Bamboo Accessories